Office location: 95 Jacobean Loop, Harrison WA, 98253
07/29/2022
Geoff
Freeland, WA
I had a 8 kWp PV system installed with a backup system of two 10 kWh batteries and an interconnected EV charger. The team did a great job, working through terrible spring (windy/rainy) weather. Paul has been fantastic troubleshooting some technical/firmware issues. Overall, a hardworking, honest, and very proficient team who I feel confident working with for the long term.
System size (kW): 8
Year installed: 2022